Thames Tideway
Secure, Compliant Metalwork for Thames Tideway
Enhanced Metal Fabrication
Steel & Glass Solutions (SGS) delivered architectural metalwork for the Thames Tideway central-west package at Chelsea Embankment Foreshore (CHEEF).
What SGS Delivered:
-
Bespoke perimeter solutions
-
SR3-rated vehicular gates
-
Riverside balustrading
-
Bronze-effect kiosks
All specified, fabricated and installed under documented quality controls.
Project Focus
CHEEF pairs public access with critical infrastructure. SGS aligned metalwork to the riverside setting & programme constraints, coordinating details with public-realm finishes and operational interfaces.
Outcome
Specification was translated into controlled fabrication & installation using material certification, weld maps & Inspection & Test Plans (ITPs). Classified items were coordinated early to confirm clearances, hinges/automation and foundations. Limited access & sequencing were managed with dimensional checks at hold points; digital verification supported fit-up and tolerance checks to reduce rework.












