top of page
3.png

Thames Tideway

Secure, Compliant Metalwork for Thames Tideway

 

Enhanced Metal Fabrication

 

Steel & Glass Solutions (SGS) delivered architectural metalwork for the Thames Tideway central-west package at Chelsea Embankment Foreshore (CHEEF).

 

What SGS Delivered:

  • Bespoke perimeter solutions

  • SR3-rated vehicular gates

  • Riverside balustrading

  • Bronze-effect kiosks

All specified, fabricated and installed under documented quality controls.

 

Project Focus

 

CHEEF pairs public access with critical infrastructure. SGS aligned metalwork to the riverside setting & programme constraints, coordinating details with public-realm finishes and operational interfaces.

 

Outcome

 

Specification was translated into controlled fabrication & installation using material certification, weld maps & Inspection & Test Plans (ITPs). Classified items were coordinated early to confirm clearances, hinges/automation and foundations. Limited access & sequencing were managed with dimensional checks at hold points; digital verification supported fit-up and tolerance checks to reduce rework.

bottom of page